Space Frame

  • Coal shed of China Datang Corporation

    Coal shed of China Datang Corporation

    Project Name: Coal shed of China Datang Corporation

    Place of Construction: Neimenggu, China

    Diameter: 106 m

    Height: 35.5 m

    Work scope: The dome shed from design, fabrication and installation

    Contract Period: 2016.3 – 2016.8

  • Coal roofing storage was finished the installation in Hubei, China

    Coal roofing storage was finished the installation in Hubei, China

    Place of Construction: Hubei, China

    Length: 325 m

    Width: 230 m

    Work scope: The space frame roofing storage shed from design, fabrication and installation

    Contract Period: 2022. 3 – 2022. 6

  • Coal shed of Weda Bay Industrial Park,Indonesia

    Coal shed of Weda Bay Industrial Park,Indonesia

    Place of Construction: Indonesia

    Length: 250 m

    Width: 93.8 m

    Height: 33 m

    Work scope: The coal shed from design, fabrication and supervision

    Contract Period: 2021.6 – 2021.10

  • Limestone shed of Shayona Cement Plant

    Limestone shed of Shayona Cement Plant

    Diameter: 73m,

    Height: 26 m

    Work scope: design, fabrication and installation

    Finished time: 2018

  • The space frame roofing storage in Philippines

    The space frame roofing storage in Philippines

    Project Name: Coal shed of Philppines Cement Plant

    Width: 76.5 m

    Length: 95 m

    Height: 21 m

    Work scope: design, fabrication and supervision

    Finished time: 2016

     

    Product details:
    This coal roofing shed is linear storage to storing coal for Philippines Cement Plant i. We contracted this project and finished the production in 2016. The supervision of installation was finished by ourselves in June, 2016. The material details is as the follows,

    No.

    Item

    Material

    Remark

    1

    Pipes Q235, Q355  

    2

    Bolt ball Cr 40  

    3

    Bolt High strength bolt S10.9

    4

    Cone head Q235  

    5

    Purlin Section C, Z Galvanized

    6

    Roofing & Cladding Grey color panel Thickness:0.5 mm

    7

    Skylight panel Transparent PVC Thickness:1.0 mm

    Application:
    It can be built as large diameter roofing shed from 20 m to 125 m for cement plant, power plant, exhibition hall, museum, school , meeting hall , sports stadium, church, roofing, train station, airport and so on.

    If you have any inquiry about linear or circular /dome roofing storage, thanks for your sending the local data including seismic zone, snow load, dead load, live load, wind speed, rain fall for checking the steel amount.

    And you can send other requirement for checking more accurate steel amount to supply the best solution.

    ABC Engineering & Trading (Jiangsu) LLC can produce 20,000 tons of steel structure and 25,000 space frame per year in our two factories. We have 15 designers and have strong design ability to supply the drawing with different standard such as ASTM, BS, IS, GB according to the requirement.

    Currently, we mainly cooperated with international EPC company including Thyssenkrupp, POSOCO, Global Thermax, SGTM. And we have installed installed limestone, coal, pre-homogenization roofing storage, sport hall, aircraft hangar, grand standby bleacher, membrane structure in Philippines, India, Indonesia, Malawi, Morocco, Turkey, Mauritius, Middle East, KSA and so on.

    Welcome you to visit our factory for technical and commercial communication.

  • Nanjing High-speed Train Station

    Nanjing High-speed Train Station

    Project name: Nanjing High-speed Train Station

    Dimension: Span: 216 m, Length:451 m

    Total building area: 97,416 ㎡

    Steel amount : 9,000 tons
    Work scope: Design, Procurement, Fabrication, Construction. The main

  • Sports Center in Ximeng, China

    Sports Center in Ximeng, China

    Short Description:

    Construction area: 22,000

    Height:32 m

    The details of material is as the follows.

  • Coal shed space frame

    Coal shed space frame

    Short Description:

    Width: 95.5m

    Length: 220m

    Contructin time: 5 months including fabrication

123 Next > >> Page 1 / 3